Live work inventory, for the 2027 stop list
Live work inventory, for the 2027 stop list
Swept 2026-11-18 (subagent, read-only) from the planning repo and its Beads, the SoR website repo and recent git activity across ~/src/life-itself/. Load and "serves 2027" are judgement, not measured hours. Not checked: Asana (Over the Mountains autumn series, Elizabeth Debold series), mediahouse Beads, actual hours.
Commits since 2026-08-01 (rough proxy for effort; ForumMagnum is likely upstream-fork noise): ForumMagnum 1069, planning 667, sor-website 512, crm 335, design 324, courses 236, wayintoai 233, asdra-planning 228, ops 159, publications 144, papers 144, wilber-wiki 135, marketing 128, mediahouse 125, wise-ai 111. Planning Beads: 137 open, 7 in progress; about half are planning, PM and AI-process work.
| Strand | Evidence it's live | Owner | Load (guess) | Serves 2027 reach and tests? |
|---|---|---|---|---|
| Over the Mountains podcast, "The Field Between Us" series | 21 episodes, newest 2026-11-11; beads lip-a7l, lip-un1 | Sylvie, Rufus, YoYo | High | Yes |
| Substack / blog | 60 posts, newest 2026-11-13; initiative sor-newsletter | Uriel | Medium | Yes |
| Magazine (Eternity issue) | magazine pages; bead lip-gpp | Sylvie | High | Partly: slow, heavy |
| Website, brand rebrand and rollout | sor-website 512 commits; projects 2606, 2608, 2617, 2645; epic lip-42k (about 12 children) | Uriel, Rufus | High | Partly: infrastructure |
| Comms infrastructure (CRM, Substack to own-stack migration) | crm 335 commits; epic lip-upn (8 children); lip-42d | Rufus | High | Partly: enables tests, migration risks the list |
| Global Connection Call and Join page | join pages; beads lip-db4, lip-t39, lip-tsg | Petronella, Sylvie | Medium | Yes: a ready test |
| Courses (Practice Ecology, sensemaking) | courses repo 236 commits; starts 2026-09-22, 2026-10-28 | Rufus | High | Partly |
| Papers and research group | papers repo 144 commits; newest paper 2026-10-08 | Rufus | Medium | Partly |
| Temple of the Sacred World | page "coming soon", design doc | Sylvie (guess) | Low–medium | No |
| Art exhibition and residencies | art pages; projects 2629, 2648 in backlog | Sylvie | Low now | Partly |
| Ecosystem map | map page (2024 content) | Rufus (guess) | Low | No |
| Planning-system trial (Beads, portfolio, weekly AI review) | planning 667, asdra-planning 228; epics lip-tqk (about 40 children), lip-q31, lip-d4l | Rufus, Asdra | High | No |
| AI guide and Way Into AI | wayintoai 233 commits; lip-d4l, lip-o6p, lip-ltx, lip-3jt | Rufus | Medium | No |
| Ops (contracts, inbox, France) | ops 159 commits; epic lip-duo | Asdra | Medium | No, but needed |
| Sylvie PA and email handling | projects 2616, 2618; epic lip-kr1 | Fae, Asdra | Medium | Indirect: frees Sylvie |
| Media House inbox and publishing | mediahouse 125 commits; project 2610 | Uriel | Medium | Yes |
| Life Itself side initiatives (Gardens of Change, incubator, topical groups, online community, wise AI, Wilber wiki) | in-progress initiatives; wise-ai 111, wilber-wiki 135 commits | Rufus | Medium in total | No; paying commitments not checked |
| One-offs (retreat, film, Commonweal visit) | projects 2627, 2628, 2647 | Rufus, Sylvie | Low | No |
| Already paused | hubs, conscious communities, events, life-guild; online shop "someday"; sensemaking studio archived | none | Zero | No |
Before stopping anything, check: the SoR newsletter embed (lip-33m, lip-upn.1) may be needed for the tests; lip-hdj.6 (retire losing strategy versions) is already a stop action.