Seeds of Renaissance — 2027 plan of work (tentative)

Very tentative. A first cut of the work implied by the 2027 strategy, taken from the actions in the 2027 LTP. Dates are likely off and owners are unconfirmed. Once the high-level plan is signed off, each item becomes a task in Beads and this page is retired; until then it is a sketch, not a tracker.

WhenActionOwner
Dec (by 18th)Count the ladder baselinePetronella, Fae
Dec"How did you hear of us?" on every sign-up; design the pulse, tagged by groupFae
DecSix months of per-piece data, with the Illich and SEO piecesUriel
DecList the strands; set the priority orderRufus
NovReset the targets from the baseline: done 25 Nov (150 regulars, 300 stretch; 30 catalysts)Rufus
Nov (v0.1 by 25th)Content strategy (2603), belowRufus (lead), Uriel, Amanda
Jan–MarRufus and Uriel run the system together and set up the AI pipeline; by end of March the routine is written down and runs without RufusRufus, Uriel
JanCommunity strategy on the ladder: welcome, way in to contribute, online engagement, asksPetronella, Fae
JanRun the pulse, then quarterly; monthly count by personFae
FebThe handoff between teams tested end to endUriel, Fae/Asdra
FebLadder page and monthly joint reviewUriel
Q1–Q2Acorn 2 running (Q1); hosting guide drafted with the first catalysts (Q2)Petronella

Related plan: the content strategy 2027 (mediahouse, project 2603), whose own actions are in mediahouse Beads under mh-93f.1.