Google Drive strategy migration

The initial phase is to recover substantive strategy sources from the Strategy folder and its subfolders into materials/ or another appropriate local source location. Preserve source URL, source ID, creation date, and any known relationship to a drawing. Check exact source IDs and compare content before importing, because an existing materials/ record may be only a short stub while a file in long-term/inputs/ or staging/gdocs/ already contains full text. The later phase will assess what is deprecated, superseded, unfinished, or never used; those judgments should not determine whether an otherwise unique source is preserved in the initial phase. The linked Excalidraw migration project records the scored drawing shortlist. Implementation tasks belong in the planning repo's Beads epic lip-hdj.

The 2026-11-17 inventory covers 80 folders and 1,163 items: 92 Google Docs, 13 Sheets, 10 Drawings, 10 Slides, 22 PDFs, 927 image/video/audio files, and 10 other files. The source inventory CSV lists all 157 non-media files with folder path, type, dates, URL, exact local evidence, and Excalidraw IDs explicitly linked in Google Doc text. All 92 Google Docs were read for text and links; Sheets, Drawings, Slides, PDFs, and other files were inventoried from metadata only. Media assets are counted here rather than queued for strategy-text import.

Of the 157 non-media sources, six have full local text, eight have a materials/ record but no confirmed full text, six are merely referenced locally, and 137 have no exact source-ID match in this repo. These labels describe local evidence, not completion of migration. A file with no exact ID match could still duplicate local content under another source or format.

Existing full local text: avoid re-importing

Existing materials records: check body before import

Google sourceExisting recordWhat the source contains
Overall SCQH 2021materials recordFoundational situation, complication, question, hypothesis, and summary.
Big Strategy mid-2022materials recordCore offers and macro, meso, micro model; explicitly links the LI meso flywheel drawing.
Macro ⇔ Meso ⇔ Micromaterials recordStrategy levels and flywheel; explicitly links the LI meso flywheel drawing.
Strategy Review Sep 2021materials recordStrategy SCQH and review of Life Itself's direction.
Pioneering a Culture reviewmaterials recordHubs, residential programs, and engagement pathway.
Big Vision theory of changematerials recordGoogle Drawing; check whether the existing image captures the source before duplicating it.
Critical Point 2021 deckmaterials recordPresentation; compare existing local rendering with source.
Life Itself v3 issue treematerials indexSpreadsheet, referenced in an index rather than present as full local content.

Other high-value sources with no full local text match

Google sourceWhy it merits initial processingDrawing connection, if explicit
Plan 2025Substantial Q3 planning and strategic synthesis.Imported 2025 Year Plan drawing
Brand Narrative 2024/2025Substantial articulation of pioneers, offer, and LI/2R relationship.—
Shaping for Strategy work 2024Situation, complication, hypothesis, and questions for the strategy.—
Life Itself theory of change narrativeText explanation of activities and theory of change.—
Shaping 2024Strategy-shaping intentions and discussions.LI activities map
Vision for Structure, Culture & LeadershipSubstantial stewardship proposal.Stewardship Structure
AET foundational SCQH 2017Early foundational hypothesis and rationale.—
Life Itself 2021 Plan, January and May revisionHistorical annual plan and revision.—
2019 SCQH and treesEarlier strategy structure in a Sheet; contents not yet read.—
Website and Offers Update 2025Large working source mixing strategy and site implementation; assess destination before import.Imported 2025 Year Plan drawing

The 2022 Strategy and Plan Doc is marked as moved to tao/plan-2022 in its Drive title; compare that destination before importing. The separate Life Itself theory of change Doc returned no paragraph text, so its embedded content needs inspection before classification. The source inventory also contains older project, brand, governance, poster, and attic items; phase two will judge their current or historical status after unique sources are preserved.